Traffic Lights Cycle Length Adjusted On Churchill Roosevelt Highway



The Traffic Management Branch of the Ministry of Works and Transport has confirmed that they have adjusted the cycle length of traffic lights along the Churchill Roosevelt Highway.

The lights adjusted include Piarco, Maloney, Mausica and O’Meara intersections.

Over the past week, some motorists have complained about the length of the cycle and its contribution to traffic build-up.

In a release, the Ministry said, “The TMB has actively monitored and tuned the lights over the period, and achieved the desired cycle length on Friday 11th August 2017.”


Post time: 09-06-2017